EBA NPL.Forbearance.Start Date of Forbearance: Difference between revisions
From Open Risk Manual
Wiki admin (talk | contribs) No edit summary |
(No difference)
|
Latest revision as of 13:19, 23 January 2021
Definition of Forbearance / Start Date of Forbearance
Forbearance.Start Date of Forbearance: Date that the current forbearance arrangement starts
- EBA Field Index 10.009
- Documentation Entry 266
Description
"Start Date of Forbearance" is the date that the current Forbearance commenced.
Field Characteristics
The field type is a Date in the format dd/mm/yyyy.
The field's importance for the Loan Tape is Critical.
The field belongs to the EBA NPL Forbearance Table.
The field applies to all of the 7 EBA NPL Asset Classes.
The field is applicable to all borrower types.
The field is Not Confidential
Disclaimer
- This text is generated automatically. Do not edit manually!
- This information is provided as is. Refer to the EBA NPL Template for pointers to definitive instructions
{{#set:Field Importance=Critical|Field Variability=Dynamic|Field Type=Date|Field Content=Event Timeline|Field Confidentiality=0}}
__SHOWFACTBOX__