Total Requirements Tables

From Open Risk Manual
Revision as of 22:55, 13 November 2023 by Wiki admin (talk | contribs) (Initial Entry)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Definition

Total Requirements Tables. Three I-O tables showing the output required to meet a given level of final use. The three tables are the commodity-by-commodity total requirements table, the industry-by-commodity total requirements table, and the industry-by-industry total requirements table. All three tables are calculated from the supplementary make and use tables. (See also “Output requirements.”)[1]

References

  1. Concepts and Methods of the US Input-Output Accounts. K.J.Horowitz, M.A.Planting, 2009