Difference between revisions of "Total Requirements Tables"

From Open Risk Manual
Line 8: Line 8:
 
<references/>
 
<references/>
  
[[Category:BEA-IO]]
+
[[Category:EEIO]]

Revision as of 00:11, 14 November 2023

Definition

Total Requirements Tables. Three I-O tables showing the output required to meet a given level of final use. The three tables are the commodity-by-commodity total requirements table, the industry-by-commodity total requirements table, and the industry-by-industry total requirements table. All three tables are calculated from the supplementary make and use tables[1]

See Also

References

  1. Concepts and Methods of the US Input-Output Accounts. K.J.Horowitz, M.A.Planting, 2009