Difference between revisions of "Requirements Tables"
From Open Risk Manual
Wiki admin (talk | contribs) (Initial Entry) |
Wiki admin (talk | contribs) |
||
Line 1: | Line 1: | ||
== Definition == | == Definition == | ||
− | '''Requirements Tables'''. There are four I-O requirements tables: Commodity-by-industry direct requirements | + | '''Requirements Tables'''. There are four I-O requirements tables: |
+ | * Commodity-by-industry direct requirements | ||
+ | * commodity-by-commodity total requirements | ||
+ | * industry-by-commodity total requirements, and | ||
+ | * industry-by-industry total requirements.<ref>Concepts and Methods of the US Input-Output Accounts. K.J.Horowitz, M.A.Planting, 2009</ref> | ||
== References == | == References == | ||
<references/> | <references/> | ||
− | [[Category: | + | [[Category:EEIO]] |
Latest revision as of 23:36, 13 November 2023
Definition
Requirements Tables. There are four I-O requirements tables:
- Commodity-by-industry direct requirements
- commodity-by-commodity total requirements
- industry-by-commodity total requirements, and
- industry-by-industry total requirements.[1]
References
- ↑ Concepts and Methods of the US Input-Output Accounts. K.J.Horowitz, M.A.Planting, 2009