Difference between revisions of "RAS Technique"
From Open Risk Manual
Wiki admin (talk | contribs) |
Wiki admin (talk | contribs) |
||
Line 3: | Line 3: | ||
== Procedure == | == Procedure == | ||
− | Assume that an | + | Assume that an input-output direct coefficients table for an n-sector economy for a given year in the past (in what follows, designate this as year “0”) and that we like to update those coefficients to a more recent year (for example, the current year, which we will designate year “1”). |
− | example, the current year, which we will designate year “1”). | ||
The RAS technique generates an estimate of these coefficients from 3n pieces of information for the year of interest (year 1). These are: (1) total gross outputs, xj (which are also needed with survey-based transactions information); (2) total interindustry | The RAS technique generates an estimate of these coefficients from 3n pieces of information for the year of interest (year 1). These are: (1) total gross outputs, xj (which are also needed with survey-based transactions information); (2) total interindustry | ||
− | |||
== References == | == References == |
Revision as of 13:56, 18 September 2023
Definition
RAS Technique or RAS Procedure or RAS algorithm was originally introduced to update IO-tables in situations in which only limited survey data are available for the projection year.
Procedure
Assume that an input-output direct coefficients table for an n-sector economy for a given year in the past (in what follows, designate this as year “0”) and that we like to update those coefficients to a more recent year (for example, the current year, which we will designate year “1”).
The RAS technique generates an estimate of these coefficients from 3n pieces of information for the year of interest (year 1). These are: (1) total gross outputs, xj (which are also needed with survey-based transactions information); (2) total interindustry