Difference between revisions of "Procurement Procedure"
From Open Risk Manual
Wiki admin (talk | contribs) |
Wiki admin (talk | contribs) |
||
Line 10: | Line 10: | ||
== Alternatives == | == Alternatives == | ||
* Alternatives to the purchase and ownership of products (lease or lease/purchase arrangements) | * Alternatives to the purchase and ownership of products (lease or lease/purchase arrangements) | ||
− | * Alternative contractual arrangements, such as | + | * Alternative contractual arrangements, such as [[Energy Performance Contracting]] (EPC) |
== Variants == | == Variants == | ||
Line 22: | Line 22: | ||
== Trials and demonstrations == | == Trials and demonstrations == | ||
If new products or methods are being proposed as part of the contract | If new products or methods are being proposed as part of the contract | ||
− | |||
== EU Materiality Threshold == | == EU Materiality Threshold == | ||
If a public procurement contract is valued above the EU threshold<ref>The latest thresholds are on the website of the European | If a public procurement contract is valued above the EU threshold<ref>The latest thresholds are on the website of the European | ||
Commission: www.ec.europa.eu/growth)</ref> the [[EU Procurement Directives]] apply. A notice must be placed in the Official Journal and the rules for each stage must be followed. | Commission: www.ec.europa.eu/growth)</ref> the [[EU Procurement Directives]] apply. A notice must be placed in the Official Journal and the rules for each stage must be followed. | ||
− | |||
− | |||
== References == | == References == |
Latest revision as of 12:23, 4 October 2023
Contents
Definition
Procurement Procedure is formal and defined sequence of steps (Procedure) that is followed by organizations in their Procurement activities.[1]
Flexible Procedures
- Pre-commercial Procedure (PCP)
- Innovation Partnership
- Competitive Dialogue
- Competititve Procedure with Negotiation
Alternatives
- Alternatives to the purchase and ownership of products (lease or lease/purchase arrangements)
- Alternative contractual arrangements, such as Energy Performance Contracting (EPC)
Variants
Allowing some flexibility around specifications
Frameworks
- Aggregated Procurement
- Central Purchasing
- Joint Purchasing
Trials and demonstrations
If new products or methods are being proposed as part of the contract
EU Materiality Threshold
If a public procurement contract is valued above the EU threshold[2] the EU Procurement Directives apply. A notice must be placed in the Official Journal and the rules for each stage must be followed.