Difference between revisions of "ESMA Residential Real Estate.Collateral.Energy Performance Certificate Provider Name"
From Open Risk Manual
Wiki admin (talk | contribs) (Created page with " == Definition of ESMA Residential Real Estate.Collateral.Energy Performance Certificate Provider Name == <b>ESMA Residential Real Estate.Collateral.Energy Performance Certi...") |
Wiki admin (talk | contribs) |
||
Line 51: | Line 51: | ||
[[Category:ESMA Residential Real Estate Collateral Table]] | [[Category:ESMA Residential Real Estate Collateral Table]] | ||
+ | [[Category:PEFA]] | ||
{{#set:Availability of ND1-ND4 Option =YES|Availability of ND5 Option =YES|Field Type=ALPHANUM-100}} | {{#set:Availability of ND1-ND4 Option =YES|Availability of ND5 Option =YES|Field Type=ALPHANUM-100}} | ||
__SHOWFACTBOX__ | __SHOWFACTBOX__ |
Latest revision as of 11:10, 18 August 2022
Contents
Definition of ESMA Residential Real Estate.Collateral.Energy Performance Certificate Provider Name
ESMA Residential Real Estate.Collateral.Energy Performance Certificate Provider Name
- Member of Table: ESMA Residential Real Estate Collateral Table
- ESMA Field Index: RREC11
Description
Enter in the legal name of the energy performance certificate provider. Where a Legal Entity Identifier (LEI) is available in the Global Legal Entity Foundation (GLEIF) database, the name entered shall match the name associated with the LEI.
Field Characteristics
Format
The field type / format is: ALPHANUM-100
No Data Options
- The field can be empty under data options ND1-ND4
- The field can be empty under data option ND5
No Data Options Legend
Option | Explanation |
---|---|
ND1 | Data not collected as not required by the lending or underwriting criteria |
ND2 | Data collected on underlying exposure application but not loaded into the originator’s reporting system |
ND3 | Data collected on underlying exposure application but loaded onto a separate system from the originator’s reporting system |
ND4 | Data collected but will only be available from YYYY-MM-DD (YYYY-MM-DD shall be completed) |
ND5 | Not applicable |
Disclaimer
- This text is generated automatically. Do not edit manually!
- This information is provided as is. Refer to the ESMA Securitisation Template for pointers to definitive instructions