Revision history of "NACE Class 43.12 - Site preparation"

From Open Risk Manual

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 15:43, 28 November 2019Wiki admin (talk | contribs). . (775 bytes) (+775). . (Created page with "== Definition == Site preparation class == Description == This class includes: * clearing of building sites * earth moving: excavation, landfill, levelling and grading of c...")